न्यूज़रूम ओडिशा
ब्रेकिंग
ओडिशा

Sambalpur: Four More Gates of Hirakud Dam Opened

Sambalpur: Four more gates of Hirakud dam have been opened to discharge the excess water from the reservoir due to the incessant rain in the upper catchment area. With this, water is being discharged through a total of 14 gates from the Hirakud dam. The IMD had predicted heavy rains in the upper catchment area. [...]

Admin•14 सितंबर 2023
Share Article:

Sambalpur: Four more gates of Hirakud dam have been opened to discharge the excess water from the reservoir due to the incessant rain in the upper catchment area.

With this, water is being discharged through a total of 14 gates from the Hirakud dam.

The IMD had predicted heavy rains in the upper catchment area. As a result, the dam authorities opened two gates at 4 pm yesterday. After estimating that over one lakh cusecs of water was coming from the upper catchment area, eight more gates were opened in the morning. But by midday, four more gates have been opened due to the inflow of one and a half lakh cusecs of water. At present, water is being discharged through a total of 14 gates. The water level of Hirkud dam stood at 628.69ft earlier in the day.

#Odisha#Featured
Share Article:

Related Articles

Newsroom•22 सित॰ 2026
Odisha Govt Transfers 4 IPS Officers
Newsroom•21 सित॰ 2026
Odisha Final Electoral Roll Published With 3.16 Crore Electors