Bhubaneswar: The Housing and Urban Development Department has prepared an action plan for management of flood and water logging in urban areas during the ensuing monsoon.
In order to avert any flood like situation and water logging during rainy season and also at the time of disaster like excessive and heavy rain, flood, cyclone etc., the Department has asked the Municipal Commissioners, all Municipal Corporations, Executive Officers, all Municipalities and NACs to take up the several measures on urgent basis.
The measures are as follow:
1. Drainage Clearance: Like previous years, ULBs have to take up joint verification with respective Drainage Division/ M.I Division of Water Resources Deptt. to ensure desilting & repair of all clogged/ choked drain channels before the onset of monsoon.
2. Inspection of drains & manholes: Due to excessive & heavy rainfall, the roads, pedestrian footpaths and drains are covered with rain water as a result of which holes or damage on the drains particularly covered drains are not visible for which people fall into the drain causing accidents and sometimes fatal.
In order to avoid such accidents, the following actions are required to be undertaken well ahead of onset of monsoon:
a) 100 % verification of all drains and machine holes (both open and closed) be made within the ULB limit.
b) In case of closed drains and machine holes, it is required to check the cover and see whether those have been damaged and there is any chance of accident.
c) Take immediate steps to repair and cover the holes.
d) In case, it is not possible to repair the same you may put appropriate signage to caution people so that accident can be avoided.
e) Cleaning, de-slting, maintenance of all drains.
f) Covering of drains with slabs and vulnerable points with nets with warning to make the people aware about it.
3. Avoidance of Drain Congestion: It is seen that large volume of construction and demolition materials are being piled up inside the drains and on the road side which run away through rain water causing drain congestion. The same should be strictly monitored. De-silting materials taken out of the drains has to be removed immediately to prevent them from re-entering drains.
4. Identification of Flood spots/ vulnerable points and De-watering: Vulnerable water logging area/ low lying areas to be identified and appropriate steps be taken for discharge of water expeditiously at the time of emergency by prepositioning pump sets.
5. Eviction from drain channels: It is seen that large volume of construction and demolition materials are being piled up inside the drains and on the road side which run away through rain water causing drain congestion. The same should be strictly monitored.
De-silting materials taken out of the drains has to be removed immediately to prevent them from re-entering drains.
6. Polythene Menace for Drain clogging: Rampant use of polythene in urban areas is a major cause for drain channel clogging leading to water logging in adjacent low Iying areas. This may be monitored scrupulously.
7. Fixing of screens in the drains: Installation of Bar Screens at appropriate places in the Secondary / Tertiary drains and Wire mesh at the outfall for removal of Solid Waste found in storm water may be ensured. The removed materials should be disposed of properly. Human Resource should be mapped to clear the screen while water is flowing heavily at regular intervals to avoid possible chokes.
Wherever there is encroachment of drain channels which causes obstruction to the free flow of either storm water, rain water or waste water, same should be demolished forthwith and channels are to be kept obstruction free.
Legal action, wherever required to be initiated against the defaulting person or institution in order to prevent them from further encroachment.
8. Repair and Restoration: Keeping in view the problems of urban inhabitants, immediate arrangements to be made for emergency repair and restoration of roads/drains etc.
9. Control of vector-borne diseases: In the rainy season, due to flood like situation, there may be outbreak of common vector-borne diseases like malaria, dengue & Japanese encephalitis & water borne diseases like diarrhoea and jaundice. So water logging in habitation areas may completely be avoided. Proper sanitation measures are to be taken with utmost care to avert these eventualities. The required cooperation from other Departments may also be ensured.
To avoid all these diseases, application of larvicides and bleaching powder in the water logging areas, cover & sealing of septic tanks & soak pits, proper disposal of garbage, cover water container etc. are to be taken up on urgent basis.
Regular fogging in the ULB areas are required to be undertaken on priority.
10. Formation of Unified Command and Control Centre: All ULBS are requested for formation of Unified Command and Control Centre headed by the Commissioner/EO with members from other line Departments/agencies including Fire Services to manage the flood like situation within their jurisdiction. The line Departments may also be requested to send their representatives as member in the said centre.
During monsoon the unified control rooms should become very active and provide all necessary assistance & coordination to public and all stakeholders in effectively managing the urban flooding and other inconveniences on war footing.
A coordination meeting with all relevant Departments & agencies may be conducted immediately and necessary office orders may be issued formally notifying the constitution of the Unified command & control centre with helpline (telephone number). This control room shall be managed by officials on roster duty basis during the operation period.
The Collectors & Commissioners are requested to ensure inter-departmental co-ordination and assistance in managing this important activity of the ULBs in view of the sensitivity and Public perception of the effectiveness of the Local Governance.
11. Involvement of elected representatives and ward committees: For proper management of the urban flooding, all efforts should be taken for involvement of the elected representatives and ward committees for management of flood and water logging in the respective areas.